Development Engineering

Jay Preston
Development Engineer

jpreston@co.volusia.fl.us
(386) 736-5926 (West Volusia)
(386) 257-6000, ext. 5926 (Daytona Beach)
(386) 423-3300, ext. 5926 (New Smyrna Beach)
FAX: (386) 740-5148

Commercial development
Complaints
F.A.Q.s
Inspections
Obtain floodplain designation
Public right-of-way abandonment
Status of plan revue
Subdividing or combining lots
Subdivision reviews
Use permits
Flood plain and elevations

Development Engineering is responsible for providing engineering reviews and inspections for subdivisions, site plans/stormwater management, subdivision exemption applications, determinations of vested rights and use permits.

Subdivision reviews

Subdivision reviews involve review of subdivision plans at the following stages:

  • Sketch plan - deals with level of development in flood plain, if any.
  • Overall development plan - preliminary layout of roads, lots, drainage retention areas, etc.
  • Preliminary plat - review of plat and construction drawings and detailed stormwater review.
  • Final plat - review of final plat.
  • Final site plan reviews consist of review of site plans for compliance with the Land Development Code. Items reviewed are: access, traffic circulation, sidewalk needs, legal parcel, turn lane requirements together with stormwater review.
  • Stormwater reviews consist of checking stormwater calculations, grading plan, soils compatibility with plan, water table determination, retention area slopes, stabilization of slopes, checking for St. Johns permits, affect on adjacent lands, etc.
  • Unrecorded subdivision determinations involve review proposals for compliance with exempted activities under the Land Development Code such as lot line adjustments, lot combinations, divisions of 2.5 acres per lot or greater, etc.
  • Use permit reviews involve reviewing submitted plans for compliance with County standards. Use permits are required before doing any type work in the right-of-way, such as driveway connections and underground utilities.

Inspections

  • Use permit inspections - Utility, preliminary driveway, road/turn lane construction, miscellaneous.
  • Complaint investigations - Obstructions in right-of-way, drainage problems.
  • Subdivision improvement inspections Progressive and final inspection of roads, underground utilities, drainage systems, retention areas.
  • Final site plan inspections
    Inspection of final site plan improvements, especially stormwater and access improvements.

To schedule inspections or to get permit or inspection status, call our automated inspection system at:
(386) 736-5928